Wastewater Lift Station Equipment Replacement
City of Redmond - $4 mill - Completed January, 2024
Replacement of equipment at five existing wastewater pumping stations, referred to as Wastewater Lift Stations 5, 6, 8, 11, and 15. This includes, but is not limited to: Removal of and replacement of pumping equipment, piping, and appurtenances within existing wet wells and valve vaults; installation and operation of temporary bypass pumping stations; site work including yard piping, fencing, concrete, and HMA paving; modification of electrical power and control systems in outdoor enclosures; removal of and replacement of emergency power generator systems and connection to existing power systems; HMA restoration for trenches and excavations; HMA overlay; landscape restoration; and other work necessary to complete the project.